Project

GM Ultium

Categories

Modular Electric,

Client

GM

Description

Medium Voltage Switch House.

Location

GM – Lordstown, Ohio

Challenge

Construction Schedule Constraints.

Solution

⦁ Flex Air designed and built a modular switch house to go in place of the standard pre-engineered building.
⦁ Deployed a 4,956 sq. – 14 section modular building containing 3 medium voltage gear line ups.
⦁ Completed with tie buss, cable buss (for field connection), battery room, and HVAC solution.
⦁ Delivered a “turnkey” solution and saved 16 weeks on the job site construction schedule.

×
img

    Contact Form

    Get In Touch

    Contact Info